Case Studies

Proof that SabiTrack delivers.

Explore how sponsors and vendors used milestone evidence, approval routing, and escrow to hit targets.

Resources
/
GridSolar • Energy • Sponsor —
/
October 14, 2025

GridSolar cut approval time with geo proofed milestones GridSolar cut approval time with geo-proofed milestones

Standardized checklists and GPS-stamped photos reduced back-and-forth and unlocked faster escrow releases.

Solaris Energy builds large-scale solar infrastructure across the globe. With Nestly, they unified their field, engineering, and operations teams into one coordinated system — and reduced planning overhead by over 40%.

About Lightspeed

Solaris Energy designs, installs, and maintains large-scale solar power systems for industrial clients and municipalities across 12 countries. Their team spans engineering, procurement, logistics, and field operations — all working together to deliver sustainable energy infrastructure.

With over 300 employees and aggressive deployment timelines, they needed a way to stay in sync without sacrificing speed or safety.

The Challenge

Solaris was scaling fast — but their coordination wasn't. Each department ran on a different workflow. Engineers tracked deliverables in spreadsheets, ops ran planning in legacy software, and field teams communicated through email. Deadlines slipped. Meetings ballooned. And updates got lost.

"We were growing faster than our systems could handle — every project started with confusion." — Emilia Nordin, Director of Operations

The Solution

Nestly became Solaris' new operating rhythm. They built repeatable workspaces for everything — from procurement workflows to field install plans. Tasks, documentation, and timelines all live in one shared space, giving real-time visibility to every stakeholder.

Cross-team planning now happens async. Status updates are trackable without needing a single meeting. Even field teams use Nestly on tablets in low-connectivity zones thanks to offline access.

The Results

40% reduction in planning time
60+ engineers and field leads onboarded in 2 weeks
3x faster handoffs between departments
Critical operations now tracked in shared, reusable workspaces

"Nestly gave us a system that actually matches the scale we're operating at. It's where every project starts now."

— Emilia Nordin, Director of Operations

Wall of Love

Hear from Our Users

See how real businesses use SabiTrack to achieve remarkable results with affiliate marketing.

Wiza allows us to export a search into a usable CSV which saves us a lot of time when setting up a new Sales email campaign.

Brendan McDonaldData Operations at PartnerStack
Background Pattern
Lightbulb

Ready to Take Control of
Your Projects?

Plan smarter, collaborate faster, and deliver
on time - every time

SabiTrack Logo

SabiTrack

Improve collaboration, monitor progress in real-time, and complete projects on time — all in one intuitive, easy-to-use dashboard.

Quick Link

Login

Resources

© 2025 SabiTrack. All right reserved.